Skip to main content

New Gwadar airport on radar again


CDWP approves project at cost of Rs51.3b, up 138% within five years
Shahbaz Rana | September 21, 2021
  
the existing airport is capable of handling only small aircraft while the new airport is being designed to cater to the needs of large airbus a 380 aircraft photo file
The existing airport is capable of handling only small aircraft while the new airport is being designed to cater to the needs of large Airbus A-380 aircraft. Photo: File


ISLAMABAD:
The government on Monday approved the New Gwadar International Airport project at an upward revised cost of Rs51.3 billion, showing an increase of 138% in its construction price within five years amid a slow pace progress on an important China-Pakistan Economic Corridor (CPEC) scheme.

The Central Development Working Party (CDWP) took the decision to revise upward the project cost. Planning Commission Deputy Chairman Jehanzeb Khan chaired the CDWP meeting. The body has a mandate to scrutinise and approve development schemes and refer the mega projects for final ratification of the Executive Committee of the National Economic Council (Ecnec).

“New Gwadar International Airport (NGIA) second revision worth Rs51.3 billion referred to the Ecnec for further consideration,” according to the Ministry of Planning handout. The second revised PC-1 of the project had been submitted by the Aviation Division to revise the scope and cost of ASF camp, CAA residential building to be funded and executed by the Pakistan side, it added.

The CDWP accorded go-ahead to the Gwadar airport being an ongoing project with the directions to “review PSDP requirements keeping in view limited development portfolio and future revenues to the country”.

Out of Rs51.3 billion, an amount of Rs18.1 billion is planned to be spent from the Public Sector Development Programme while the remaining Rs33.8 billion will be provided by China. China is providing a grant of 1.52 billion yuan or Rs34 billion for the project. Oman had also given a $17.5 million grant for the project.

The project was part of phase-1 of CPEC that was supposed to be completed by 2018. However, the construction of the New Gwadar International Airport is also falling behind schedule along with dozens of other CPEC projects.

The Planning Commission deputy chairman also directed that combined electricity generation from solar and wind should be explored to meet the future needs for Gwadar Airport.

The new Gwadar airport is considered important for the development of Gwadar Port and its free zone. The Ministry of Planning is now gradually taking back control of CPEC
https://tribune.com.pk/story/2321135/new-gwadar-airport-on-radar-again

Comments

Popular posts from this blog

SSG Commando Muddassir Iqbal of Pakistan Army

“ Commando Muddassir Iqbal was part of the team who conducted Army Public School operation on 16 December 2014. In this video he reveals that he along with other commandos was ordered to kill the innocent children inside school, when asked why should they kill children after killing all the terrorist he was told that it would be a chance to defame Taliban and get nation on the side. He and all other commandos killed children and later Taliban was blamed. Muddassir Iqbal has deserted the military and now he is  with mujahedeen somewhere in AF PAK border area” For authenticity of  this tape journalists can easy reach to his home town to interview his family members or   ISPR as he reveals his army service number” Asalam o Alaikum: My name is Muddassir Iqbal. My father’s name is Naimat Ali. I belong to Sialkot divison (Punjab province), my village is Shamsher Poor and district, tehsil and post office  Narowal. Unfortunately I was working in Pakistan army. I feel embarrassed to tell yo

CPEC Jobs in Pakistan, salary details

JOBS...نوکریاں چائنہ کمپنی میں Please help the deserving persons... Salary: Salary package in China–Pakistan Economic Corridor (CPEC) in these 300,000 jobs shall be on daily wages. The details of the daily wages are as follows; Welder: Rs. 1,700 daily Heavy Duty Driver: Rs. 1,700 daily Mason: Rs. 1,500 daily Helper: Rs. 850 daily Electrician: Rs. 1,700 daily Surveyor: Rs. 2,500 daily Security Guard: Rs. 1,600 daily Bulldozer operator: Rs. 2,200 daily Concrete mixer machine operator: Rs. 2,000 daily Roller operator: Rs. 2,000 daily Steel fixer: Rs. 2,200 daily Iron Shuttering fixer: Rs. 1,800 daily Account clerk: Rs. 2,200 daily Carpenter: Rs. 1,700 daily Light duty driver: Rs. 1,700 daily Labour: Rs. 900 daily Para Engine mechanic: Rs. 1,700 daily Pipe fitter: Rs. 1,700 daily Storekeeper: Rs. 1,700 daily Office boy: Rs. 1,200 daily Excavator operator: Rs. 2,200 daily Shovel operator: Rs. 2,200 daily Computer operator: Rs. 2,200 daily Security Supervisor: Rs.

RWR Advisory: Belt and Road at a Glance

This edition covers developments from March 12 - March 26..  Belt and Road at a Glance   Subscribe to the Belt and Road Monitor Top Developments China National Machinery Industry Corporation, commonly known as Sinomach, has agreed to  build  a $845 million, 255-mile railway across  Iran , building upon a sustained period of growth for Chinese investment in Iran that accelerated after Xi Jinping’s state visit to the country in January 2016. The railway will link the cities of Tehran, Hamedan and Sanandaj. China Civil Engineering Construction, a subsidiary of CRCC, is currently also  building  a 263-km railway line from Kermanshah to Khosravi. According to Chinese entrepreneur Lin Zuoru, who  owns  factories in Iran, “Iran is at the center of everything.”On March 23, China’s Ministry of Commerce announced that foreign direct investment by Chinese companies in 50 Belt and Road countries fell by 30.9% year-on-year. While the Ministry stated that this number covers investment across al