Skip to main content

Govt formulates three plans to address water, power shortage in Gwadar


INP
August 28, 2021

ISLAMABAD: “The federal government and Balochistan government have formulated three plans to address the water and electricity issues in Gwadar.The plan include the completion of the 300 MW...


ISLAMABAD: “The federal government and Balochistan government have formulated three plans to address the water and electricity issues in Gwadar.

The plan include the completion of the 300 MW coal-fired power plant, connecting Gwadar with the national electricity grid, and providing immediate relief by transmitting electricity from Iran,” Senator Kauda Babar said while, responding to recent protests rallied in Gwadar.

As opposed to a distorted report by Guardian which claimed protests in Gwadar were against China’s Belt and Road Initiative, Babar clarified that “the protests have nothing to do with BRI and CPEC, according to Gwadar Pro.

The issue was local in nature, related to water and electricity shortages. Therefore, it is wrong and ill-intended to link these protests as anti-CPEC protests.”

Water and electricity shortage has long been a historical problem for the Gwadar people. “It is the responsibility of the local administration and Government of Balochistan to provide the demanded services,” Babar stressed.

In this regard, the government is holding negotiations with Iran on the transmission of electricity to Gwadar, which will be concluded in the next 2-4 months so that a short-term relief can be provided to the residents.

Besides, the work on the 300 megawatts coal-fired power plant is also in full swing and will be functional by October 2023, as per a report of Gwadar Pro.

“After getting assurances from the government, people have ended the protests,” Babar said, adding that Pakistan is a democratic country and the government has allowed its people to exercise the right to protest and express their demands.

As for Guardian’s allegations that no achievements have been made in Gwadar under the CPEC, Babar pointed out that, since the inauguration of CPEC, dividends have come in various ways. “Before CPEC, we had load shedding of about 18 hours. Currently, load shedding does not happen in Pakistan, even in the summer months. Employment opportunities have been created in the form of power plants. Industrialization has started due to the availability of sufficient electricity. These dividends emerge with CPEC and will continue to grow in future.”

https://www.thenews.com.pk/print/884390-govt-formulates-three-plans-to-address-water-power-shortage-in-gwadar

Comments

Popular posts from this blog

SSG Commando Muddassir Iqbal of Pakistan Army

“ Commando Muddassir Iqbal was part of the team who conducted Army Public School operation on 16 December 2014. In this video he reveals that he along with other commandos was ordered to kill the innocent children inside school, when asked why should they kill children after killing all the terrorist he was told that it would be a chance to defame Taliban and get nation on the side. He and all other commandos killed children and later Taliban was blamed. Muddassir Iqbal has deserted the military and now he is  with mujahedeen somewhere in AF PAK border area” For authenticity of  this tape journalists can easy reach to his home town to interview his family members or   ISPR as he reveals his army service number” Asalam o Alaikum: My name is Muddassir Iqbal. My father’s name is Naimat Ali. I belong to Sialkot divison (Punjab province), my village is Shamsher Poor and district, tehsil and post office  Narowal. Unfortunately I was working in Pakistan army. I feel embarrassed to tell yo

CPEC Jobs in Pakistan, salary details

JOBS...نوکریاں چائنہ کمپنی میں Please help the deserving persons... Salary: Salary package in China–Pakistan Economic Corridor (CPEC) in these 300,000 jobs shall be on daily wages. The details of the daily wages are as follows; Welder: Rs. 1,700 daily Heavy Duty Driver: Rs. 1,700 daily Mason: Rs. 1,500 daily Helper: Rs. 850 daily Electrician: Rs. 1,700 daily Surveyor: Rs. 2,500 daily Security Guard: Rs. 1,600 daily Bulldozer operator: Rs. 2,200 daily Concrete mixer machine operator: Rs. 2,000 daily Roller operator: Rs. 2,000 daily Steel fixer: Rs. 2,200 daily Iron Shuttering fixer: Rs. 1,800 daily Account clerk: Rs. 2,200 daily Carpenter: Rs. 1,700 daily Light duty driver: Rs. 1,700 daily Labour: Rs. 900 daily Para Engine mechanic: Rs. 1,700 daily Pipe fitter: Rs. 1,700 daily Storekeeper: Rs. 1,700 daily Office boy: Rs. 1,200 daily Excavator operator: Rs. 2,200 daily Shovel operator: Rs. 2,200 daily Computer operator: Rs. 2,200 daily Security Supervisor: Rs.

A ‘European Silk Road’

publication_icon Philipp Heimberger ,  Mario Holzner and Artem Kochnev wiiw Research Report No. 430, August 2018  43 pages including 10 Tables and 17 Figures FREE DOWNLOAD The German version can be found  here . In this study we argue for a ‘Big Push’ in infrastructure investments in greater Europe. We propose the building of a European Silk Road, which connects the industrial centres in the west with the populous, but less developed regions in the east of the continent and thereby is meant to generate more growth and employment in the short term as well as in the medium and long term. After its completion, the European Silk Road would extend overland around 11,000 kilometres on a northern route from Lisbon to Uralsk on the Russian-Kazakh border and on a southern route from Milan to Volgograd and Baku. Central parts are the route from Lyon to Moscow in the north and from Milan to Constanţa in the south. The southern route would link Central Europe with the Black Sea area and