Skip to main content

Signs of unease emerging between China, Pakistan over future of CPEC: Report



The report said the hype created by Islamabad through projecting CPEC as a panacea for all problems is losing steam.
ANI | , Islamabad
PUBLISHED ON APR 03, 2021 09:37 PM IST


A general view of the port before the inauguration of the China Pakistan Economic Corridor port in Gwadar, Pakistan. (Reuters File Photo)

Amid lack of progress on the China-Pakistan Economic Corridor (CPEC), subtle signs of unease have emerged between the two countries over the future direction and funding of mega projects, under increasing scrutiny of media and the public.


According to a report published in Modern Diplomacy, the outcome of recent meetings between the two countries reveals significant scaling down of Pakistan's expectations regarding the inclusion of more projects under CPEC phase II.

Fabien Baussart in an opinion piece for Modern Diplomacy said "While the country has for long portrayed USD 6.8 billion Main Line-I project to be the main artery of the Pakistan Railways and tried to convince China for financing the project, the Chinese side has tried to avoid any commitment for funding."

Pakistan has unable to secure any favourable consideration including the concessionary loan at an interest rate of one per cent, said Baussart while adding that China is only willing to offer a mix of commercial and concessional loans to fund the rail project backed by suitable guarantees by Pakistan.



"Although it is the largest among the lot, ML-1 is not the only project facing significant delays. According to Pak CPEC Authority, so far, 17 projects worth USD 13 billion have been completed while another 21 projects having an estimated cost of USD 12 billion are under implementation," the report said.

Baussart further argued that despite high publicity, hardly any Chinese investors are showing interest in setting up of units in the Special Economic Zones being established as part of industrial cooperation under CPEC.

The report further said the hype created by Islamabad through projecting CPEC as a panacea for all problems is losing steam.

"The project not only lacks clear direction to steer through but continues to struggle due to absence of coordination among various executing agencies. The realization is gradually dawning upon various government agencies that Pakistan's economy has failed to achieve any real benefit from the CPEC," the report said.


Adding to that, the Senate Special Committee on CPEC informed the upper house of parliament earlier this month that the Pakistan planning, development and special initiatives ministry does not have the capacity to coordinate and manage projects like CPEC.

The committee stated in a report that the ministry clearly lacks vision and critical thinking as an institution, adding that several lapses in the project due to mismanagement and lack of strategic planning were pointed out in the last two-and-a-half years, The Express Tribune reported.

In 2015, China announced an economic project in Pakistan worth USD 46 billion. With the CPEC, Beijing aims to expand its influence in Pakistan and across Central and South Asia in order to counter the influence of the United States and India.


The CPEC would link Pakistan's southern Gwadar port (626 kilometres west of Karachi) in Balochistan on the Arabian Sea to China's western Xinjiang region. It also includes plans to create road, rail, and oil pipeline links to improve connectivity between China and the Middle East

https://www.hindustantimes.com/world-news/signs-of-unease-emerging-between-china-pakistan-over-future-of-cpec-report-101617465302652.html


Comments

Popular posts from this blog

SSG Commando Muddassir Iqbal of Pakistan Army

“ Commando Muddassir Iqbal was part of the team who conducted Army Public School operation on 16 December 2014. In this video he reveals that he along with other commandos was ordered to kill the innocent children inside school, when asked why should they kill children after killing all the terrorist he was told that it would be a chance to defame Taliban and get nation on the side. He and all other commandos killed children and later Taliban was blamed. Muddassir Iqbal has deserted the military and now he is  with mujahedeen somewhere in AF PAK border area” For authenticity of  this tape journalists can easy reach to his home town to interview his family members or   ISPR as he reveals his army service number” Asalam o Alaikum: My name is Muddassir Iqbal. My father’s name is Naimat Ali. I belong to Sialkot divison (Punjab province), my village is Shamsher Poor and district, tehsil and post office  Narowal. Unfortunately I was working in Pakistan army. I feel embarrassed to tell yo

CPEC Jobs in Pakistan, salary details

JOBS...نوکریاں چائنہ کمپنی میں Please help the deserving persons... Salary: Salary package in China–Pakistan Economic Corridor (CPEC) in these 300,000 jobs shall be on daily wages. The details of the daily wages are as follows; Welder: Rs. 1,700 daily Heavy Duty Driver: Rs. 1,700 daily Mason: Rs. 1,500 daily Helper: Rs. 850 daily Electrician: Rs. 1,700 daily Surveyor: Rs. 2,500 daily Security Guard: Rs. 1,600 daily Bulldozer operator: Rs. 2,200 daily Concrete mixer machine operator: Rs. 2,000 daily Roller operator: Rs. 2,000 daily Steel fixer: Rs. 2,200 daily Iron Shuttering fixer: Rs. 1,800 daily Account clerk: Rs. 2,200 daily Carpenter: Rs. 1,700 daily Light duty driver: Rs. 1,700 daily Labour: Rs. 900 daily Para Engine mechanic: Rs. 1,700 daily Pipe fitter: Rs. 1,700 daily Storekeeper: Rs. 1,700 daily Office boy: Rs. 1,200 daily Excavator operator: Rs. 2,200 daily Shovel operator: Rs. 2,200 daily Computer operator: Rs. 2,200 daily Security Supervisor: Rs.

A ‘European Silk Road’

publication_icon Philipp Heimberger ,  Mario Holzner and Artem Kochnev wiiw Research Report No. 430, August 2018  43 pages including 10 Tables and 17 Figures FREE DOWNLOAD The German version can be found  here . In this study we argue for a ‘Big Push’ in infrastructure investments in greater Europe. We propose the building of a European Silk Road, which connects the industrial centres in the west with the populous, but less developed regions in the east of the continent and thereby is meant to generate more growth and employment in the short term as well as in the medium and long term. After its completion, the European Silk Road would extend overland around 11,000 kilometres on a northern route from Lisbon to Uralsk on the Russian-Kazakh border and on a southern route from Milan to Volgograd and Baku. Central parts are the route from Lyon to Moscow in the north and from Milan to Constanţa in the south. The southern route would link Central Europe with the Black Sea area and