Skip to main content

China assures Murad of inclusion of KCR, Keti Bandar projects in CPEC



Welcome


KARACHI: Chinese authorities have assured the Sindh government that they would pursue Karachi Circular Railway, Keti Bandar and other projects to officially include them in the China-Pakistan Economic Corridor (CPEC)-related projects.

This emerged on Tuesday in a meeting between Chief Minister Syed Murad Ali Shah and a Chinese government delegation led by Beijing’s Ambassador in Pakistan Nong Rong.

The other delegation members were Chinese Consul General Li Bijian, defence attaché Maj Gen Chen Wen Rong, consular Bao Zhong, deputy defence attaché Senior Col Ji Xinqi, Lt Col Di Weichao, first secretary Wang Xianfeng and third secretary Wu Linglin.

Financing request for KCR

The chief minister told the delegation that on the request of his government the KCR was included in CPEC on Dec 3, 2016. The project was approved and included in 6th Joint Coordination Committee (JCC). He added that the project was approved by Ecnec at a cost of $1.97 billion in Oct 2017.

The CM says centre hasn’t addressed KCR issues despite his multiple requests

Mr Shah said that the KCR had been part of all JCC meetings and in all the meetings it was stated to be a feasible and viable project but there were major obstacles that needed to be removed.

He added that the obstacles included sharing of a framework agreement, sovereign guarantee by the finance division, concessional finance request to Chinese government by the federal government, right of way for KCR at common corridor between ML-1 and KCR.

He said that he had been requesting the federal government to resolve the issues, but the issues were still unaddressed.

“In the 9th JCC meeting the KCR was again discussed and it was resolved that the Pakistan side will submit the financing request to the Chinese side,” he said and added it had not been submitted yet.

Talking about the current situation of the KCR, Mr Shah said that the federal government included two projects in the public sector development programme of FY 21, which were Rs1.85bn organisation of train on existing KCR alignment and revival of KCR Phase-II for Rs8.7bn.

He said that he had included three projects in the provincial ADP 2020-21, which include revival of KCR (CPEC framework) for Rs207.5bn, construction of a boundary fence along the KCR alignment for Rs2.3 million and construction of underpasses/flyovers on railway crossing along KCR route for Rs5bn.

The visiting delegation assured the chief minister that they would take up the KCR projects in the CPEC-related meeting.

Keti Bandar

The chief minister said that Keti Bandar was located about 107km from Thatta city and 150km from Karachi via Gharo and it was very promising in terms of future prospects.

He said that the Keti Bandar project was an important part of the Sindh government’s strategy towards developing the energy sector.

Mr Shah said that 4,000 acres of land had been identified for the project and a feasibility study was completed for installation of a 1,320MW power plant along with a railway line, coal jetty and allied infrastructure.

“A financial viability assessment and bid management report has also been completed and the transaction advice report is being awaited,” he added.

The CM said that the project was part of CPEC framework since 2017. Earlier, the project was referred to the Joint Working Group (JWG) for consideration. “After completion of the studies, the project is now ready to be taken up in the main framework,” he said.

The other projects that came under discussion included Thar coal energy, infrastructure, special economic zone, Dhabeji, socio-economic development projects.

The Chinese delegation said that their first CPEC project of 660MW Thar coal power plants was functioning successfully and on the same pattern all the CPEC-related projects would be completed on a fast-track basis.

Published in Dawn, April 7th, 2021


https://www.dawn.com/news/1616838

Comments

Popular posts from this blog

SSG Commando Muddassir Iqbal of Pakistan Army

“ Commando Muddassir Iqbal was part of the team who conducted Army Public School operation on 16 December 2014. In this video he reveals that he along with other commandos was ordered to kill the innocent children inside school, when asked why should they kill children after killing all the terrorist he was told that it would be a chance to defame Taliban and get nation on the side. He and all other commandos killed children and later Taliban was blamed. Muddassir Iqbal has deserted the military and now he is  with mujahedeen somewhere in AF PAK border area” For authenticity of  this tape journalists can easy reach to his home town to interview his family members or   ISPR as he reveals his army service number” Asalam o Alaikum: My name is Muddassir Iqbal. My father’s name is Naimat Ali. I belong to Sialkot divison (Punjab province), my village is Shamsher Poor and district, tehsil and post office  Narowal. Unfortunately I was working in Pakistan army. I feel embarrassed to tell yo

CPEC Jobs in Pakistan, salary details

JOBS...نوکریاں چائنہ کمپنی میں Please help the deserving persons... Salary: Salary package in China–Pakistan Economic Corridor (CPEC) in these 300,000 jobs shall be on daily wages. The details of the daily wages are as follows; Welder: Rs. 1,700 daily Heavy Duty Driver: Rs. 1,700 daily Mason: Rs. 1,500 daily Helper: Rs. 850 daily Electrician: Rs. 1,700 daily Surveyor: Rs. 2,500 daily Security Guard: Rs. 1,600 daily Bulldozer operator: Rs. 2,200 daily Concrete mixer machine operator: Rs. 2,000 daily Roller operator: Rs. 2,000 daily Steel fixer: Rs. 2,200 daily Iron Shuttering fixer: Rs. 1,800 daily Account clerk: Rs. 2,200 daily Carpenter: Rs. 1,700 daily Light duty driver: Rs. 1,700 daily Labour: Rs. 900 daily Para Engine mechanic: Rs. 1,700 daily Pipe fitter: Rs. 1,700 daily Storekeeper: Rs. 1,700 daily Office boy: Rs. 1,200 daily Excavator operator: Rs. 2,200 daily Shovel operator: Rs. 2,200 daily Computer operator: Rs. 2,200 daily Security Supervisor: Rs.

A ‘European Silk Road’

publication_icon Philipp Heimberger ,  Mario Holzner and Artem Kochnev wiiw Research Report No. 430, August 2018  43 pages including 10 Tables and 17 Figures FREE DOWNLOAD The German version can be found  here . In this study we argue for a ‘Big Push’ in infrastructure investments in greater Europe. We propose the building of a European Silk Road, which connects the industrial centres in the west with the populous, but less developed regions in the east of the continent and thereby is meant to generate more growth and employment in the short term as well as in the medium and long term. After its completion, the European Silk Road would extend overland around 11,000 kilometres on a northern route from Lisbon to Uralsk on the Russian-Kazakh border and on a southern route from Milan to Volgograd and Baku. Central parts are the route from Lyon to Moscow in the north and from Milan to Constanţa in the south. The southern route would link Central Europe with the Black Sea area and