Skip to main content

Bridge linking Karachi with Balochistan in unstable condition


APP
September 06, 2020

ISLAMABAD: A video went viral on social media regarding bridge linking Karachi with Balochistan showed the bridge is in an unstable condition with its pillars not in good shape and score of piles...

ShareNext Story >>>
an image

ISLAMABAD: A video went viral on social media regarding bridge linking Karachi with Balochistan showed the bridge is in an unstable condition with its pillars not in good shape and score of piles accumulated in the water around pillars.

National Highway Authority (NHA) clarifying contents of a video regarding Hub Bridge linking Karachi with Balochistan said the bridge is structurally stable and there is nothing wrong with the structural stability of it.

Clarifying the actual position, the spokesman said, the existing bridge is 500 metres long, having 21 numbers of spans, and this old bridge was constructed 50 years ago.

He explained that shape of the pillars, which were not looking straight in the video, was as per original design of the structure of the bridge. Jacketing of piles has already been carried by NHA in year 2017-18 to enhance the service life of this bridge, he said adding, NHA has already carried out asphalt and replaced the expansion joint of this bridge.

The scoring of piles which is evident in the viral video has occurred due to outflow of excess water from Hub Dam during the current cyclonic rainfall.

Besides, he added, a main problem was illegal collection of soil, sand (Retti) and Bajri by the tractor mafia due to which the pillars have been exposed up to Natural ground level. It is strongly recommended that the local administration should impose ban on collection of sand etc. underneath this bridge, the spokesman stated.

NHA, Balochistan, has always given priority to Hub Bridge for its repair and maintenance, he informed. This scoring would be rectified by NHA on top priority. Besides all, with the advice and recommendations of Structural Expert NHA, Col. Muhammad Iqbal, the rehabilitation works had been carried out recently including removing and replacing old expansion joints and asphaltic wearing course had been carried out this year.

The district administration has also been informed time and again of the same. Member West Zone, NHA Balochistan, Shahid Ihsanullah and Structural Expert NHA, were visiting the site for detailed inspection, he said.


https://www.thenews.com.pk/print/710815-bridge-linking-karachi-with-balochistan-in-unstable-condition

Comments

Popular posts from this blog

SSG Commando Muddassir Iqbal of Pakistan Army

“ Commando Muddassir Iqbal was part of the team who conducted Army Public School operation on 16 December 2014. In this video he reveals that he along with other commandos was ordered to kill the innocent children inside school, when asked why should they kill children after killing all the terrorist he was told that it would be a chance to defame Taliban and get nation on the side. He and all other commandos killed children and later Taliban was blamed. Muddassir Iqbal has deserted the military and now he is  with mujahedeen somewhere in AF PAK border area” For authenticity of  this tape journalists can easy reach to his home town to interview his family members or   ISPR as he reveals his army service number” Asalam o Alaikum: My name is Muddassir Iqbal. My father’s name is Naimat Ali. I belong to Sialkot divison (Punjab province), my village is Shamsher Poor and district, tehsil and post office  Narowal. Unfortunately I was working in Pakistan army. I feel embarrassed to tell yo

CPEC Jobs in Pakistan, salary details

JOBS...نوکریاں چائنہ کمپنی میں Please help the deserving persons... Salary: Salary package in China–Pakistan Economic Corridor (CPEC) in these 300,000 jobs shall be on daily wages. The details of the daily wages are as follows; Welder: Rs. 1,700 daily Heavy Duty Driver: Rs. 1,700 daily Mason: Rs. 1,500 daily Helper: Rs. 850 daily Electrician: Rs. 1,700 daily Surveyor: Rs. 2,500 daily Security Guard: Rs. 1,600 daily Bulldozer operator: Rs. 2,200 daily Concrete mixer machine operator: Rs. 2,000 daily Roller operator: Rs. 2,000 daily Steel fixer: Rs. 2,200 daily Iron Shuttering fixer: Rs. 1,800 daily Account clerk: Rs. 2,200 daily Carpenter: Rs. 1,700 daily Light duty driver: Rs. 1,700 daily Labour: Rs. 900 daily Para Engine mechanic: Rs. 1,700 daily Pipe fitter: Rs. 1,700 daily Storekeeper: Rs. 1,700 daily Office boy: Rs. 1,200 daily Excavator operator: Rs. 2,200 daily Shovel operator: Rs. 2,200 daily Computer operator: Rs. 2,200 daily Security Supervisor: Rs.

A ‘European Silk Road’

publication_icon Philipp Heimberger ,  Mario Holzner and Artem Kochnev wiiw Research Report No. 430, August 2018  43 pages including 10 Tables and 17 Figures FREE DOWNLOAD The German version can be found  here . In this study we argue for a ‘Big Push’ in infrastructure investments in greater Europe. We propose the building of a European Silk Road, which connects the industrial centres in the west with the populous, but less developed regions in the east of the continent and thereby is meant to generate more growth and employment in the short term as well as in the medium and long term. After its completion, the European Silk Road would extend overland around 11,000 kilometres on a northern route from Lisbon to Uralsk on the Russian-Kazakh border and on a southern route from Milan to Volgograd and Baku. Central parts are the route from Lyon to Moscow in the north and from Milan to Constanţa in the south. The southern route would link Central Europe with the Black Sea area and