Skip to main content

The China-Pakistan Economic Corridor has a weak link, satellite images show


The road through Gojal Valley in Gilgit-Baltistan region of Pakistan-occupied Jammu & Kashmir remains a problem for through traffic on the CPEC.

COL. VINAYAK BHAT (RETD)Updated: 12 July, 2019 1:08 pm IST

Satellite images show that the CPEC has a weak link — the road through Gojal Valley in the Gilgit-Baltistan region of the Karakoram mountains | Source: Col. Vinayak Bhat (retd.)

Text Size: A- A+

New Delhi: Ever since China cut funding for the China-Pakistan Economic Corridor over corruption allegations, work on the trillion-dollar Belt and Road Initiative, President Xi Jinping’s dream project, has been progressing slowly.

India has also raised objections to the project a number of times, since the corridor passes through Pakistan-occupied Kashmir.

But now, satellite imagery shows that the CPEC has a weak link — the road through Gojal Valley in the Gilgit-Baltistan region of the Karakoram mountains. ThePrint takes a closer look at why it could be the Achilles Heel of the CPEC.

Massive landslide

On 4 January 2010, a massive landslide occurred near Attabad, blocking the Hunza river and the Karakoram Highway (KKH). The enormity of the landslide was understood only by March 2010, when almost 30 kilometres of the KKH went under water and many villages upstream were flooded.

The 142 Road Maintenance Battalion (RMB) under the Frontier Works Organisation (FWO) was pressed into service, supposedly with the help of Chinese engineers, to create a spillway through 2.5 billion cubic feet of debris damming the Hunza river.

Source: Col. Vinayak Bhat (retd.)

There were indications about an impending disaster on satellite imagery as old as 2006, since the landslide at Attabad became active. The image clearly shows a dam being formed across the river with boulders from the landslide, in an almost man-made fashion.

The difficult job of clearing the landslide started in March 2010, but hardly made a dent in the 130m-200m high natural dam.

Advertisement

Advertisement

Source: Col. Vinayak Bhat (retd.)

The people of Gojal got frustrated due to apathy displayed by the government of Pakistan, and started working on the spillway, losing precious lives in the process.

The damming of the Hunza river waters created a huge lake, stretching up to 30 km behind the landslide zone, beyond the town of Pasu. Residents then started using the lake to travel by boat. Today, the Hunza Lake or Attabad Lake has stabilised at 9 km from the spillway near Attabad.

The massive efforts to open the road link were unsuccessful, so Pakistan sought the help of China and the World Bank.

Source: Col. Vinayak Bhat (retd.)

Five tunnels covering a total of approximately 8 km were dug, and in 2016, the KKH was finally reopened for through traffic after six-and-a-half years. The first large convoy sent on this road was a car rally from Beijing to Muscat, Oman.

The old Shishkat bridge, which had been washed away after remaining under water for four years, and a new bridge, whose piers had been completed before 2010, was finally constructed.

Status in different seasons

Although the KKH has been open for nearly three years now, traffic has to be restrained due to the tunnels en route being small in size, and not being able to take sustained two-way traffic.

Source: Col. Vinayak Bhat (retd.)

In summer, images from the last couple of months show a turquoise-coloured lake with some water sports taking place on it. The road is open for traffic, indicated by vehicles observed on the road.

Source: Col. Vinayak Bhat (retd.)

However, it is in the winter months, between October and March, that the road becomes a weak link for the CPEC, because it is blocked due to heavy snowfall and remains closed for traffic.

Source: Col. Vinayak Bhat (retd.)

On clear days, satellite images display a frozen lake with an ice layer on the top. Those wishing to travel in and out of Gojal have to trek about 8-10 km on the lake with their loads.

The Chinese have not yet decided to invest in this area, possibly due to a combination of reasons, including pressure from India and other countries. But this weakness in the CPEC could also have factored into its hesitation.

https://theprint.in/defence/the-china-pakistan-economic-corridor-has-a-weak-link-satellite-images-show/261945/

Comments

Popular posts from this blog

SSG Commando Muddassir Iqbal of Pakistan Army

“ Commando Muddassir Iqbal was part of the team who conducted Army Public School operation on 16 December 2014. In this video he reveals that he along with other commandos was ordered to kill the innocent children inside school, when asked why should they kill children after killing all the terrorist he was told that it would be a chance to defame Taliban and get nation on the side. He and all other commandos killed children and later Taliban was blamed. Muddassir Iqbal has deserted the military and now he is  with mujahedeen somewhere in AF PAK border area” For authenticity of  this tape journalists can easy reach to his home town to interview his family members or   ISPR as he reveals his army service number” Asalam o Alaikum: My name is Muddassir Iqbal. My father’s name is Naimat Ali. I belong to Sialkot divison (Punjab province), my village is Shamsher Poor and district, tehsil and post office  Narowal. Unfortunately I was working in Pakistan army. I feel embarrassed to tell yo

CPEC Jobs in Pakistan, salary details

JOBS...نوکریاں چائنہ کمپنی میں Please help the deserving persons... Salary: Salary package in China–Pakistan Economic Corridor (CPEC) in these 300,000 jobs shall be on daily wages. The details of the daily wages are as follows; Welder: Rs. 1,700 daily Heavy Duty Driver: Rs. 1,700 daily Mason: Rs. 1,500 daily Helper: Rs. 850 daily Electrician: Rs. 1,700 daily Surveyor: Rs. 2,500 daily Security Guard: Rs. 1,600 daily Bulldozer operator: Rs. 2,200 daily Concrete mixer machine operator: Rs. 2,000 daily Roller operator: Rs. 2,000 daily Steel fixer: Rs. 2,200 daily Iron Shuttering fixer: Rs. 1,800 daily Account clerk: Rs. 2,200 daily Carpenter: Rs. 1,700 daily Light duty driver: Rs. 1,700 daily Labour: Rs. 900 daily Para Engine mechanic: Rs. 1,700 daily Pipe fitter: Rs. 1,700 daily Storekeeper: Rs. 1,700 daily Office boy: Rs. 1,200 daily Excavator operator: Rs. 2,200 daily Shovel operator: Rs. 2,200 daily Computer operator: Rs. 2,200 daily Security Supervisor: Rs.

A ‘European Silk Road’

publication_icon Philipp Heimberger ,  Mario Holzner and Artem Kochnev wiiw Research Report No. 430, August 2018  43 pages including 10 Tables and 17 Figures FREE DOWNLOAD The German version can be found  here . In this study we argue for a ‘Big Push’ in infrastructure investments in greater Europe. We propose the building of a European Silk Road, which connects the industrial centres in the west with the populous, but less developed regions in the east of the continent and thereby is meant to generate more growth and employment in the short term as well as in the medium and long term. After its completion, the European Silk Road would extend overland around 11,000 kilometres on a northern route from Lisbon to Uralsk on the Russian-Kazakh border and on a southern route from Milan to Volgograd and Baku. Central parts are the route from Lyon to Moscow in the north and from Milan to Constanţa in the south. The southern route would link Central Europe with the Black Sea area and