Skip to main content

Barhni-Kathmandu railway line: Modi government looks to expedite the proposed India-Nepal rail link project

By: Devanjana Nag

Published: July 9, 2019 3:40:08 PM

The survey for new broad gauge line from Barhni in Uttar Pradesh, to Kathmandu, capital of Nepal was sanctioned in the year 2015-16.

Work on the proposed railway project can only start after the inter-governmental Memorandum of Understanding (MoU) is signed.

India to Nepal railway line project: The Modi government is looking to expedite the proposed railway project, linking Barhni in Uttar Pradesh to Kathmandu in Nepal, and is awaiting the neighbouring country’s concurrence for the inter-governmental agreement. Recently, Minister of State for Railways Suresh Angadi told the Lok Sabha that the Ministry of External Affairs is following up with Nepal and is looking to expedite the process for the railway project, which will make travelling easy between both the countries. During the Question Hour, the minister also said that the survey has been completed for the five kilometres of the line in the Indian territory.

According to the report, the survey for new broad gauge line from Barhni in Uttar Pradesh, to Kathmandu, capital of Nepal was sanctioned in the year 2015-16. Railway Minister Piyush Goyal in a written reply stated that work on the proposed railway project can only start after the inter-governmental Memorandum of Understanding (MoU) is signed. However, for this, concurrence/comment of the Nepal government is required, he said. In September 2016, a draft MoU was shared by the Modi government with the government of Nepal regarding reconnaissance engineering-cum-traffic survey of the proposed line. However, till date, no response has been received from the Nepal government on this proposal, Goyal added.

Last year, it was reported that to facilitate people-to-people contact and bulk movement of goods, India will build a strategic railway link between Raxaul in Bihar and Kathmandu. It was agreed that the Indian government would carry out preparatory survey work within one year, in consultation with the Nepal government. Also, the implementation and funding modalities of the project would be finalized by the two sides based on the Detailed Project Report (DPR). Last year, India expressed appreciation for Nepal’s commitment to expeditiously resolve all outstanding issues, including land availability for the ongoing railway projects, connecting both the countries.


https://www.financialexpress.com/infrastructure/railways/barhni-kathmandu-railway-line-modi-government-looks-to-expedite-the-proposed-india-nepal-rail-link-project/1638015/

Comments

Popular posts from this blog

SSG Commando Muddassir Iqbal of Pakistan Army

“ Commando Muddassir Iqbal was part of the team who conducted Army Public School operation on 16 December 2014. In this video he reveals that he along with other commandos was ordered to kill the innocent children inside school, when asked why should they kill children after killing all the terrorist he was told that it would be a chance to defame Taliban and get nation on the side. He and all other commandos killed children and later Taliban was blamed. Muddassir Iqbal has deserted the military and now he is  with mujahedeen somewhere in AF PAK border area” For authenticity of  this tape journalists can easy reach to his home town to interview his family members or   ISPR as he reveals his army service number” Asalam o Alaikum: My name is Muddassir Iqbal. My father’s name is Naimat Ali. I belong to Sialkot divison (Punjab province), my village is Shamsher Poor and district, tehsil and post office  Narowal. Unfortunately I was working in Pakistan army. I feel embarrassed to tell yo

CPEC Jobs in Pakistan, salary details

JOBS...نوکریاں چائنہ کمپنی میں Please help the deserving persons... Salary: Salary package in China–Pakistan Economic Corridor (CPEC) in these 300,000 jobs shall be on daily wages. The details of the daily wages are as follows; Welder: Rs. 1,700 daily Heavy Duty Driver: Rs. 1,700 daily Mason: Rs. 1,500 daily Helper: Rs. 850 daily Electrician: Rs. 1,700 daily Surveyor: Rs. 2,500 daily Security Guard: Rs. 1,600 daily Bulldozer operator: Rs. 2,200 daily Concrete mixer machine operator: Rs. 2,000 daily Roller operator: Rs. 2,000 daily Steel fixer: Rs. 2,200 daily Iron Shuttering fixer: Rs. 1,800 daily Account clerk: Rs. 2,200 daily Carpenter: Rs. 1,700 daily Light duty driver: Rs. 1,700 daily Labour: Rs. 900 daily Para Engine mechanic: Rs. 1,700 daily Pipe fitter: Rs. 1,700 daily Storekeeper: Rs. 1,700 daily Office boy: Rs. 1,200 daily Excavator operator: Rs. 2,200 daily Shovel operator: Rs. 2,200 daily Computer operator: Rs. 2,200 daily Security Supervisor: Rs.

A ‘European Silk Road’

publication_icon Philipp Heimberger ,  Mario Holzner and Artem Kochnev wiiw Research Report No. 430, August 2018  43 pages including 10 Tables and 17 Figures FREE DOWNLOAD The German version can be found  here . In this study we argue for a ‘Big Push’ in infrastructure investments in greater Europe. We propose the building of a European Silk Road, which connects the industrial centres in the west with the populous, but less developed regions in the east of the continent and thereby is meant to generate more growth and employment in the short term as well as in the medium and long term. After its completion, the European Silk Road would extend overland around 11,000 kilometres on a northern route from Lisbon to Uralsk on the Russian-Kazakh border and on a southern route from Milan to Volgograd and Baku. Central parts are the route from Lyon to Moscow in the north and from Milan to Constanţa in the south. The southern route would link Central Europe with the Black Sea area and