Skip to main content

CPEC expressway hits roadblock in Himalayas

https://tribune.com.pk/story/1446215/cpec-expressway-hits-roadblock-himalayas/

By Mohammad Zubair Khan

Published: June 29, 2017


Protestors in Abbottabad demonstrate against lack of compensation, environmental degradation. PHOTO COURTESY: Mohammad Zubair Khan



The E 35, or Hazara Expressway, is a 110 kilometre under-construction expressway linking Hasan Abdal in Pakistan’s Punjab province with Haripur, Havelian, Abbottabad, Mansehra, Shinkiari, Battagram and Thakot in the province of Khyber Pakhtunkhwa (K-P).

These cities are famous for the beauty of their natural surroundings, nestled as they are in the Himalayas. The expressway is facing the ire of local people for the damage it is doing to that environment.

People affected by the construction work in the districts of Battagram and Abbottabad have brought the construction to a halt. In Battagram work resumed after negotiations, but in Abbottabad locals are not allowing work to begin on a ten kilometre stretch.

ADVERTISEMENT

Ad

A sneak peak into the ‘CPEC Master Plan’

Anwar Baig, a property dealer and the senior member of the action committee set up in Battagram district told thethirdpole.net  that the tribal jirga set a deadline of July 5 for the government to fulfil the demands raised by the committee. If this deadline was not met, construction work in Battagram would be stopped as well.

Ongoing construction work on the Hazara Expressway, Battagram. PHOTO COURTESY: Atta Ullah Nasim

“We will not compromise on the compensation [for land acquired by the government for the expressway], but we are also concerned about the environmental hazards which are now affecting the local communities,” he said.

Baig said that earlier, the temperature in Battagram never went beyond 30 degrees Celsius, but this year it had soared to 40. The locals were blaming this spike on the felling of trees and the sustained used of heavy machinery in the area.

The committee had demanded that a revised plan be presented to deal with these environmental changes, especially the cutting of trees and the construction work, he added.

Malik Maqsood Ahmed, a British-Pakistani, with businesses in London, is the president of the committee of the affected people in Abbottabad. He said that until their demands were met, they would not allow the construction of the road.

Both Baig and Ahmed are clear that they do not oppose the construction, or the China Pakistan Economic Corridor (CPEC), but they want fair compensation for the land, as had been promised, and a reduction in the environmental destruction in the region.

According to the information obtained from the National Highway Authority (NHA) and the revenue ministry of K-P, 120 villages and 5,000 families will be affected by the road project. Half of these families who will have to relocate are from the lower middle class.

According to the K-P forest department, 27,059 trees have already been cut down and 50,000 more will be felled for the project.

Pakistan faces challenges in building economic corridor with China

When contacted, the K-P Environment Protection Agency said that the NHA had done an Environment Impact Assignment (EIA) report in 2013 but had not shared the results.

Men busy cutting pine trees in Abbottabad. PHOTO: COURTESY: Sultan Dogar

The Asian Development Bank (ADB) had uploaded an EIA report obtained in 2012, but the construction work only started in 2016 when the mega expressway route was changed and extended from Havalian to Thakot. It is not clear if the change and extension of the route had been factored in.

According to legal experts a new EIA report must be filed, and a No Objection Certificate (NOC) needs to be issued. This is legally binding under the Environmental Protection Act (2014) of Khyber Pakhtunkhwa.

Malik Amin Aslam, the Chairperson of Green Growth Program K-P and global Vice President of IUCN, said, “The EIA is a tool which would compile the environmental costs and benefits of all CPEC projects including the effect of tree cutting if being done. The cutting of any tree does certainly have a damaging effect on local climatic conditions.”

“This is certainly a very fragile region ecologically and also one which is highly vulnerable to climate change owing to its geographic topography. In fact, what we have recommended through The International Union for Conservation of Nature (IUCN), is to carry out a Strategic Environmental Assessment (SEA) of all CPEC projects which would provide a clear picture of the environmental impacts and the possible remedial measures required. Such an undertaking would not only ensure the eco-integrity, public transparency and global credibility of CPEC but also strengthen a long term sustainable future for Pakistan,” added Aslam, a former environment minister of Pakistan.

Debunking myths on CPEC

Mandi Zaman, a former deputy attorney general of K-P, backs the idea of an SEA. He said, “Pakistan and its Himalayan Hindu Kush region is already facing natural disasters due to climate change and environmental degradation. Now if the construction of the mega projects ignores the environment, it will bring more destruction to the community.”

Mustaq Ahmad Ghani, an elected Member of the K-P Assembly from Abbottabad and spokesperson for the K-P government, said that K-P is already facing financial losses as well as the loss of lives due to climate change. In this scenario, it is important to do a proper environment study in the area where CPEC infrastructure construction is underway.

He said that the provincial government was in touch with federal authorities to convince them to pay reasonable compensation to those affected, and to conduct an environmental study that is of international standards.

With the July 5 deadline fast approaching, it is to be seen how federal and provincial authorities deal with the demands of the people in the path of CPEC.

This article originally appeared on thethirdpole.net

Comments

Popular posts from this blog

Balochistan to establish first medical university

https://www.dawn.com/news/1366135

The Newspaper's Staff CorrespondentOctober 25, 2017QUETTA: The provincial cabinet on Tuesday approved the draft for establishing a medical university in Balochistan.Health minister Mir Rehmat Saleh Baloch made the announcement while speaking at a press conference after a cabinet meeting.“The cabinet has approved the draft of the medical university which would be presented in the current session of the Balochistan Assembly,” he said, adding with the assembly’s approval the Bolan Medical College would be converted into a medical university.Published in Dawn, October 25th, 2017

CPEC Jobs in Pakistan, salary details

JOBS...نوکریاں چائنہ کمپنی میںPlease help the deserving persons...Salary:Salary package in China–Pakistan Economic Corridor (CPEC) in these 300,000 jobs shall be on daily wages. The details of the daily wages are as follows;Welder: Rs. 1,700 dailyHeavy Duty Driver: Rs. 1,700 dailyMason: Rs. 1,500 dailyHelper: Rs. 850 dailyElectrician: Rs. 1,700 dailySurveyor: Rs. 2,500 dailySecurity Guard: Rs. 1,600 dailyBulldozer operator: Rs. 2,200 dailyConcrete mixer machine operator: Rs. 2,000 dailyRoller operator: Rs. 2,000 dailySteel fixer: Rs. 2,200 dailyIron Shuttering fixer: Rs. 1,800 dailyAccount clerk: Rs. 2,200 dailyCarpenter: Rs. 1,700 dailyLight duty driver: Rs. 1,700 dailyLabour: Rs. 900 dailyPara Engine mechanic: Rs. 1,700 dailyPipe fitter: Rs. 1,700 dailyStorekeeper: Rs. 1,700 dailyOffice boy: Rs. 1,200 dailyExcavator operator: Rs. 2,200 dailyShovel operator: Rs. 2,200 dailyComputer operator: Rs. 2,200 dailySecurity Supervisor: Rs. 2,200 dailyCook for Chinese food: Rs. 2,000 dailyCook…

China’s 'Digital Silk Road': Pitfalls Among High Hopes

https://thediplomat.com/2017/11/chinas-digital-silk-road-pitfalls-among-high-hopes/


Will information and communication technologies help China realize its Digital Silk Road?By Wenyuan WuNovember 03, 2017In his speech at the opening ceremony of China’s 19th Party Congress, President Xi Jinping depicted China as a model of scientific and harmonious development for developing nations. Xi’s China wants to engage the world through commerce but also through environmental protection and technological advancement. This includes Beijing’s efforts to fight climate change with information and communication technologies (ICTs) that it plans to export along its “One Belt One Road” initiative (OBOR). Xi may have ambitious plans, but could China be throwing up obstacles in its own way?In his speech, the Chinese president emphasized the need to modernize the country’s environmental protections. The Chinese state is taking an “ecological civilization” approach to development and diplomacy, with a natio…